Failed Your ERRCS Test? Don’t Panic — This Happens Often
If your building just failed an Emergency Responder Radio Coverage System (ERRCS) test, you are not alone. Modern construction materials — especially low-E glass, metal structures, and dense insulation — frequently block public safety radio signals inside buildings.
We design, install, test, and commission ERRCS/BDA systems to help get your building compliant and ready for AHJ approval.
Speak With AN BDA System / ERRCS Expert Now: 866-206-5967

Fire departments require reliable communication for first responders. When radios don’t work everywhere inside the structure, occupancy approval can be delayed until the issue is corrected.
The good news: this is a very solvable problem.
Why Buildings Fail Radio Coverage Testing
Most property owners assume radios will work automatically because cell phones do. They don’t operate the same way.
Public safety radios use dedicated frequencies that must penetrate stairwells, basements, mechanical rooms, and elevator shafts.
Buildings typically fail for these reasons:
• Underground levels block signal
• Stairwells act like concrete shields
• Low-E glass reflects radio frequencies
• Metal roofing absorbs signal
• Larger floor plates exceed signal reach
• Nearby towers are too far away
If inspectors recorded “insufficient signal strength” or “grid failure,” the building must add an in-building radio system.
What the Fire Marshal Is Actually Requiring
When you fail an ERRCS test, the Authority Having Jurisdiction (AHJ) is requiring compliance with IFC Section 510 / NFPA 1225 (previously NFPA 72).
This means installing a Public Safety DAS / BDA System that:
• Amplifies incoming emergency radio signal
• Distributes it throughout the building
• Provides battery backup during outages
• Allows first responders to communicate anywhere inside
The goal is not stronger signal — it’s guaranteed communication coverage.
The Fastest Way To Pass Re-Inspection
Most delays happen because owners don’t know the order of steps.
Here’s the proper sequence:
Review failed test report
Perform RF survey & system design
Submit plans to AHJ for approval
Install ERRCS / BDA system
Conduct acceptance test with inspector
When handled correctly, re-inspection can often occur within weeks instead of months.
How Berk-Tel Helps Buildings Pass Quickly
Berk-Tel Communications specializes in nationwide ERRCS compliance and works directly with inspectors and fire marshals.
We provide:
• Same-day budget ranges
• Engineering & design packages
• AHJ coordination
• Turn-key installation
• Acceptance testing support
Our goal is simple — help you obtain occupancy approval without construction delays.